Variation Method:
In 100 days only 2.5 km rod i.e. 16.66 % of work has been completed
Men Days Road (km)
45 100 ↓ 2.5
X ↑ 200 12.5↑
Arrows show the directions of variation of quantity with respect to each other
x45=100×12.5200×2.5
x = 113 men;
Required men to be increased, = 113 - 45 = 68
x = 113 men;
Required men to be increased, = 113 - 45 = 68
",
"dateCreated": "7/24/2019 10:09:12 AM",
"author": {
"@type": "Person",
"name": "Nitin Sir"
}
},
"suggestedAnswer": {
"@type": "Answer",
"text": "
Solution:
Variation Method:
In 100 days only 2.5 km rod i.e. 16.66 % of work has been completed
Men Days Road (km)
45 100 ↓ 2.5
X ↑ 200 12.5↑ Arrows show the directions of variation of quantity with respect to each other
x45=100×12.5200×2.5
x = 113 men;
Required men to be increased, = 113 - 45 = 68
",
"dateCreated": "7/24/2019 10:09:12 AM"
}
}